Discussions

« go back

SHIPPING 330 knots

Combination View Flat View Tree View
Threads [ Previous | Next ]
toggle
SHIPPING 330 knots
Answer
29/07/14 20:15
* CROSS COUNTRY SHIPPING 330 knots. SAVES 48,700 KM
* OPEN CAST MINING DESERT SAND, COAL, ORE, SOIL BY NEW METHOD 
   EXCAVATOR, SHIP 330 knt AT PIT LOAD, STORE DROP.
* FPSO  3 MM WALL THICK. 3000 M DIA/DEPTH 21.2 Bn CBM. $100/CBM
* ALL FUELS- FOSSIL, RENEWABLE FUELS  POWER PLANTS
* POWER PLANTS- COAL, LNG, OIL, NUCLEAR, CSP SOLAR ON BARGE.
* 660 knt[ JET SPEED] FERRY FARE 1C/KM  ROI= 1440 %
* CONTAINER  330 knt  FREIGHT 60C/KM/TEU  ROI= 1080 %
* JET 1200 KMPH  FARE 2.5 C/KM ROI= 120 %
* MISSILE 3, 6 MACH
andy
Attachments: Andy Technology Automotive, Rail Design.pdf (87.2k), Business Plan 500 mn$ SHIPPING of section 1.pdf (113.7k), C S P TECHNOLOGY (2).pdf (10.6k), CROSS COUNTRY SHIPPING FIG.pdf (304.0k), OPEN CAST MINING.pdf (56.6k)

RE: SHIPPING 330 knots
Answer
29/07/14 20:18 as a reply to andy m appan.
low Carbon Design :: Co2e  1/6 of normal g/t-km
cargo, ferry, container, VLCC, 330, 660 knt
Missile. sea, sky missile . 3, 6 mach
jet 1200, 2400 kmph; fare 2.5c/km roi=120 %
360 days task is done in 12 days. 360*11/330=12
fare 1c/km; freight 3c/km/t; 60c/km/teu
inv  cost $ 4000/grt. roi= 1080 %
INV 100 Mn$  Return  500 Mn$/Yr.
Repaid 200 Mn$ IN 2 Yrs
andy appan, m.e 49 yrs expert, India.
 
TRANSPORT  STANDARDS:
TRANSPORT= TON-KMPH
ENGINE EFFICIENCY= HP/FUEL-Hr
TRANSPORT EFFICIENCY= TON-KMPL
EMISSION, CO2e=G/Hr= 2325*Lit/Hr
ANDY

RE: SHIPPING 330 knots
Answer
29/07/14 20:24 as a reply to andy m appan.
·       EQUITY FUND FOR INNOVATION, INCUBATION.
·       INV  500 Mn$  REPAID 1000 Mn$ in  4 Yrs
·       ALL DIESEL ENGINE CAN RUN ON ANY FUEL, COAL.
·       CAR 2T, 100 HP / 600 CC, 200 KMPH 60 KMPL[ 142 MPGe] CO2e 39 G/KM
·       TRUCK 15T, 240 HP/1600 CC, 200 KMPH, 30 KMPL[ 71 MPGe] CO2e 77.5  G/KM
·       BULLET TRAIN ON GROUND 824 KMPH FOR 600 KMPH ON RAIL. SAME TON-HP
·       330, 660 KNOTS  SHIPPING  FARE 1C/KM ROI= 1080 %
·       CROSS COUNTRY SHIPPING SAVES 48,700 KM
·       OPEN CAST MINING OF DESERT SAND - Mechanised Pit Load, Store Drop
·       FPSO  3 MM WALL THICK 3000 M DIA/DEPTH 21.2 Bn CBM. COST $100/CBM
·       1200, 2400 KMPH JET  FARE 2.5 C/KM  ROI= 120 %
·       6 MACH SKY, SEA MISSILES